Thursday, April 28, 2016

Bathroom

The bathroom is coming along.  Next job is the vanity unit and washbasin.  Then the towel rail can go on.

Dressers

Here are the lovely dressers either side of the front doors.  They'll be painted dark duck egg blue and have beech surfaces to compliment the kitchen work surfaces.

Monday, April 25, 2016

Cross stitch

Here's the sample piece for the dresser doors inspired by Pinterest. Had to stop the cross stitch before all the holes were used as I ran out of time but I know the finished pieces on the boat will look really great.

Cupcake bathroom

Its difficult to get the full effect of the candy pink bathroom wall from this photo. It's bubblicious!

Thursday, April 21, 2016

Interior is all white

The interior painting is now done and the boat is now dazzlingly bright inside!



Thursday, April 14, 2016

Interior stage 1 complete

The initial construction is complete and the interior has been cleared out ready to be sprayed white. After that we will start constructing the kitchen units and dressers, install the radiators and finish the bathroom.



Sunday, April 10, 2016

Lounge detailing

The partial bulkhead between the dinette and the kitchen ties together the interior and will have elegant trim and detailing like the bed box, all painted in white eggshell.


Bathroom progress

The bulkheads are all in now and Toby is working on the bathroom furniture. Here is the washbasin vanity unit which will be painted moss green with a top of white Hanex composite.



Bed box

Dave has nearly finished constructing the bed box with it elegant curved trim.